Room · Proof
Evidence stack
What is observed, derived, supplied as a business assumption, or genuinely not supplied — for every claim this Room makes about itself.
Evidence checks
Venue exposure vs. zero-impairment boundary
Actual $700,000.00 vs. boundary $280,187.99.
Current topology mandatory stress adequacy
Fails mandatory stress.
Architecture transition requirement
Indeterminate — insufficient data.
PLR / deployed-capital consistency check
Difference 1.25E-9 vs. tolerance 1E-8.
Collateral feasibility
Technical requirement vs. commercially supportable capacity at the supplied target Operator ROE.
| Metric | Value | Provenance |
|---|---|---|
| Technical Gross OFLC required | $1,021,118.16 | Validated model reference · Derived |
| Commercial max Gross OFLC boundary | $231,637.95 | Validated model reference · Derived |
| Feasibility gap | -$789,480.21 | Validated model reference · Derived |
| Feasibility ratio | 22.68% | Validated model reference · Derived |
| Status | Infeasible under supplied inputs | Validated model reference · Derived |
| Binding cause | Collateral cost binding | Validated model reference · Derived |
Operator return
Actual vs. target Operator ROE under the supplied assumptions.
| Metric | Value | Provenance |
|---|---|---|
| Actual Operator ROE | -12.84% | Validated model reference · Derived |
| Target Operator ROE | 15.0% | Validated model reference · Business input |
| Required net income for target | $45,950.32 | Validated model reference · Derived |
| Deficit vs. target | -$85,280.76 | Validated model reference · Derived |
Participant & protocol economics
Genuinely not computable from this run's supplied inputs — shown as not supplied, never as zero.
| Metric | Value | Provenance |
|---|---|---|
| Participant modeled net economic outcome | NOT SUPPLIED | Validated model reference · Unset |
| Protocol net margin | NOT SUPPLIED | Validated model reference · Unset |